Refurbishing 10 uniquely finished bedrooms in a tight programme

The project’s success was rooted in its comprehensive planning phase. Over four months, A.C. Beck’s team collaborated closely with the hotel and the appointed interior designers. Key planning activities included:

  • Design Consultation: A.C. Beck engaged in several design consultation sessions to understand the vision for each bedroom. The goal was to create unique, cohesive aesthetics that reflected the hotel’s brand while providing a distinct experience in each room.
  • Material Selection: Choosing the right materials was crucial. The team explored various wallpaper textures, patterns, and high-quality paint options. Samples were tested on-site to ensure they met durability, aesthetic, and safety standards.
  • Scheduling: Given the limited two-week window for actual execution, a detailed schedule was drafted. This included timelines for stripping old finishes, preparing surfaces, applying new wallpapers and paints, and allowing adequate drying time.
  • Logistics Coordination: The procurement and delivery of materials had to be timed perfectly. A.C. Beck coordinated with suppliers to ensure all materials were on-site before the project commenced, minimizing the risk of delays.

The execution phase key steps included:

  1. Site Preparation: The team arrived on-site with all necessary tools and materials. Rooms were prepped by covering furniture and floors, ensuring no damage occurred during the process.
  2. Surface Preparation: Proper surface preparation was vital for achieving a high-quality finish. This involved stripping walls, repairing any damage, and priming surfaces.
  3. Wallpaper Application: Each room featured a unique wallpaper design. Skilled craftsmen carefully applied the wallpapers, ensuring perfect alignment and seamless joins.
  4. Painting: The paintwork required precision, especially where multiple colours and finishes were involved. The team used high-quality paints to achieve smooth, consistent coverage.
  5. Quality Control: Throughout the project, a dedicated quality control manager inspected each room to ensure the work met A.C. Beck’s high standards. Any imperfections were promptly addressed.

/ How we delivered

Client

Hedsor House

Contract Value

Undisclosed.

Programme

2 weeks

Challenges

Time Constraint: The primary challenge was the two-week completion deadline. A.C. Beck overcame this by employing additional skilled workers and extending working hours while maintaining high safety and quality standards. Design Complexity: Each room had unique design requirements, which increased the complexity of the project. A detailed project plan and continuous communication with the interior designers ensured that each design was executed flawlessly. Logistical Hurdles: Ensuring timely delivery of materials required precise coordination. A.C. Beck mitigated potential delays by sourcing materials from multiple suppliers and maintaining a buffer stock.

Results

The project was completed on time, within budget, and to the client’s satisfaction. The hotel's management praised A.C. Beck for their professionalism, efficiency, and the stunning transformation of the bedrooms. The redecoration not only enhanced the aesthetic appeal of the rooms but also significantly improved guest satisfaction scores.

Hedsor House 10 Bedroom overhaul
/ How we work

Stability in a sea of challenge

We are going to be here tomorrow, the day after and into the future because our families futures are worth working hard for.
/ How we work

Commitment to the cause

There is more to AC Beck than just a business, at its heart is sense of commitment that goes beyond one generation into another.
/ How we work

Family run business since 1953

Starting from humble beginnings Aubrey Cecil Beck began trading in 1953, A.C. Beck is into its fourth generation moving towards a big future.
/ How we work

Proud owners of the Royal Warrant

Awarded in April 2020, A.C. Beck were granted the Royal Warrant By Appointment to Her Majesty The Queen as recognition for Painting, Decorating & Building Services for over 8 years of continuous works.
A C Beck have consistently proved their commitment to; quality, H&S, programme dedication and cost effectiveness. They have achieved the highest quality on projects such as the US Embassy and Battersea Power Station. Their non-adversarial approach and high-quality product mean they forge long-standing relationships with Main Contractors, including Sir Robert McAlpine. I would have no hesitation recommending A C Beck. A quality, effectively run family business.
Mark Andrews, Project Commercial Director, Sir Robert McAlpine Ltd

Invite us to tender or contact us today

A.C. Beck means – job done. From Heathrow Terminal 5 and the Madejski Stadium to Hampton Court Palace and Eton College. AC Beck proudly provides painting, decorating and renovation services for commercial and residential projects across the South East.

With an experienced and highly skilled workforce. We are efficient, organised and reliable. We don’t make clients choose between cost and quality.

Contact